Capacity Chart

CAPACITY CHART - HALLS

Centrally Air-conditioned halls 5,200 – 10,000 TR
Uninterrupted Power Supply 16 MW + 2 MW + 2 MW (SOLAR POWER)
Floor Ports Every 6.5 m
Freight Lifts @ 5 tonne each 20 Nos
Visitor Lifts @ 1 tonne/13 persons 12 Nos
Escalators 30 Nos
Storage & Warehousing facilities 10,000 sqm
Multiple Buggies and E-Rickshaws 12 nos
Catwalk with branding facilities.
Elaborate Signage’s and guiding systems.
Fire Alarm and Fire Fighting Systems.
24 X 7 Fire Control Rooms
Eight Halls (1 – 8) 3,456 sqm each
Four Halls (9 – 12) 6,250 sqm each
Two Halls (14 – 15) 6,120 sqm each
Total Area (Conference Halls) 64,948 sqm
Foyer Area 8,420 sqm
Washroom 24 Nos
Clear Ceiling Height 5.3m- 13.5m
Floor Loading Capacity 750 – 1,500 – 30,000 kg/sqm
Vehicle Entrance 9-15: 7 mtr (w) x 8 mtr (H)
Visitor Entrance 9-15:  3.6 mtr(W) x 4 mtr(H)
Vehicle Entrance 1,3,5,7 : 7.5 mtr (w) x  5.5 mtr (H)
Visitor Entrance (Glass door) 1,.3:  4.9  mtr(W)  x 2.3 mtr(H)
Visitor Entrance (Glass Door) 5,7  :  4.9  mtr(W)  x 2.9 mtr(H)
Plinth Area in front of 9-15: 6977.04 sqm
& Adjacent to 15: 4136.74 sqm
Behind hall 14 & 15:  9050 sqm
Plinth Area (In Front of CFB Parking): 14000 sqm